Orion Painting and Coatings


  • Home
  • Projects
  • Contact
  • About us

Projects



Current and Recent Projects



New projects



1.



Logan, Utah Waste Water Treatment PLant



New wastewater plant Logan, Utah. MWH Constructors 2020-2022

Project includes four new clarifier mechanism, concrete tank membrane liners, pipes, steel, concrete/masonry sealers, and interior steel ceiling painting.



2.



Park City, UTah 3 Kings water Plant



New fresh water drinking plant in Park City, Utah. Alder Construction 2021-2022. Project includes concrete/masonry sealers, steel roof structure coating, concrete containment membrane liner systems, pipe coatings, int/ext steel vessel coating, and floors.



3.



Provo, Utah Waste Water Treatment Plant



Wastewater treatment plant expansion in Provo, Utah. Alder Construction 2021-2023. Project includes concrete tank membrane liner systems, steel roof structure coating, pipes, concrete/masonry sealer, and floors.



4.



Municipal Culinary and Sewer water



We are proud to be involved in several projects for various municipalities throughout the state. We have painted dozens of pump houses, sewer lift stations, meter valves and manholes.



Orion Painting and Coatings


9802 N 5740 W Highland, Utah 84003